The Beita Shanxi Hub Station Project in Changji, Xinjiang is located in Qitai County, Changji Hui Autonomous Prefecture. Designed with a main transformer capacity of 2×180+1×240 MVA, the facility delivers 1220kV line to Jiji Lake 750kV Substation. It further connects to nine renewable energy plants, three photovoltaic stations, and six wind farms, collectively generating a total capacity of 600 MW.

        Company personnel are responsible for wind field operation and maintenance and scheduling.