The Pakistan project, located in Sindh Province, Pakistan, is a typical mine-mouth power station with an installed capacity of 2×330MW. The coal mine project will be constructed simultaneously with the mine-mouth power station.

Our company has participated in the project with over 30 personnel, who have experienced all major events during the construction period. After entering commercial operation, we assisted the owner in promptly handling various unexpected accidents during the operation of the unit, and received unanimous praise from the owner. Through continuous exploration and experimentation on the characteristics of local lignite, such as high volatile content and flammability, we have accumulated rich experience in the combustion of lignite in fluidized bed boilers.