In summer, the demand for electricity increases because of the high temperature.In order to ensure the stable operation of equipment, the project department of Xinjiang Beita Mountain junction station started the emergency plan to ensure a smooth summer.

Strengthen equipment inspection and strengthen the safety line

The staff will increase the number of inspection, check and maintain the core equipment, accurately record the data, and ensure the stability of the equipment.
        Optimize the operating environment
        The project department cleaned the equipment and maintained the air conditioning fan.Reduce the risk of equipment overheating
        Improve emergency response capacity
        The project department has improved the emergency plan, enhanced the response capacity and established an information sharing mechanism.
        Staying committed to our position, protecting the power artery
        Under the high temperature, the operation and maintenance personnel carefully operate, record and maintain the equipment, and always stick to their posts. "The booster station is an important link of power transmission, and we are more careful, the power grid is more safe." This is the common belief of the operation and maintenance team.
At present, the operating parameters of all equipment in Beita Mountain junction station are stable and the load carrying capacity is sufficient. The project department will continue to pay attention to weather changes and load fluctuations to provide a solid guarantee for the safe and stable operation of the power grid.