Shandong Heze Chengwu Wind Power Operation and maintenance Project Department focuses on the standardization of the station, carries out a comprehensive self-inspection of the site work, and promotes the implementation of standardized work with strict standards and pragmatic measures.
        The self-inspection was personally led by the project manager, with full staff participation, establishing a coordinated inspection framework involving all levels and departments. The inspection covered equipment at the site, collector lines, and transformer substations. Each task was rigorously conducted according to standardized procedures, from monitoring operational parameters and line connections to reviewing maintenance records of transformer substations. This comprehensive approach ensured thorough checks with no blind spots, guaranteeing that no potential risks were overlooked.
        For the problems found in the inspection process, the staff will register them in detail as soon as possible. Formulate rectification plans to ensure that all problems can be solved in a timely and thorough manner, and truly integrate the standard requirements into the whole process of work.
        Through this self-inspection and rectification work, it has provided a strong guarantee for the safe and stable operation of the station. In the next step, the project department will continue to improve the management level of the station.